1 380kV Transmission Line from Jubail 380/230 kV SS. To Maaden 380kV Sub Station 243.7 Saudi Mining Co. 01.11.07 20.10.09
2 Turnkey Construction of 132 kV OHL Line Length: 251 km From Tabook S/S To Tayma S/S 71 SEC(WR), Jeddah 01.07.02 30.07.04
3 Turnkey Construction of 132 kV OHL Line Length: 251 km From Tabook S/S To Tayma S/S Maaden 380kV Sub Station 153 SEC(CRB), Riyadh 01.11.99 30.05.04
4 380 Kv Transmission Line Rabigh - Madinah ( Foundation and Tower Erection ). 26.58 SEC West / Jeddah Jan.91 May.92
5 Design, Supply of Materials, and Commissioning of 6x40 MVA, 110/15 kV Power Transformers for Extension of Al Bayah Substation Madinah Al Munawwarah. 12.6 SEC West (EWR) / Jeddah Aug95 Apr.98
6 Design, supply, and commissioning of 6x40 MVA, 110/15 kV Power Transformers for Extension of Jeddah Substations. 12.6 SEC West (EWR) / Jeddah Nov96 Nov.98
7 380 kV and 132 kV Overhead Transmission Lines From PP-9 (S/S 9009)to S/S 9001 To Existing Riyadh-Al Kharj Line. Installation Work Including Tower Foundations & Tower Erection. 25 SEC, Central / Riyadh / (Sub Contract) Mar96 May97
8 Design, Supply of Materials and Construction of 380 kV double Circuit overhead Transmission Line from Ghazlan II To Alfadhili and Ghunan Substation. Line Length ; 288.4 Km.Power Plant 406 Dammam / (Main Contractor) June97 July99
9 Design, Supply of Material and Construction of 380 kV Double Circuit Overhead Transmission Line from HVE Substation Diversion Point of Rabigh- KMT Line 22.6 SEC West (EWR) / Jeddah / (Main Contractor) Nov98 Nov20
10 Design, Supply of Materials and Construction of 132 kV Double Circuit Overhead Transmission Lines in Riyadh, Quieieh & Qassim. Line length ; 211 km. Muzahmeya, 160 SEC Central / Riyadh / (Main Contractor) Nov.2000 July2005
11 110 Kv OHTL From Loop in Point of Madinah South - Bir Ali Line To New 110Kv Madinah Industrial City S/S 10.5 SEC Central / (Main Contractor) Jan.2001 Jan.2002
12 Kharkhair Electrification Project; Including Design, Supply of Materials, Installation and Commissioning of Diesel Works of the Power House and Residential Camp. Distribution up to Customer Services Including Civil & Building Station Along with 13.8 Kv Substation and Transmission / Power 49.18 SEC Abha 1/8/95 20/5/00
13 Al Qwaigeelah Electrification Project; Including Design, Supply of Materials, Installation and Commissioning of 3x2.65 Foam System, Buildings , ……etc. Plant, 3 x 2000 Cum. Fuel Storage tanks, Fire fighting Systems, Diesel Power Station. Including water treatment plant, fuel treatment M.W 64.58 SEC Dammam 10/6/98 15/10/01
14 Extension of Kharkhair Electrification Project; Including Design, Supply of Materials, Installation and Commissioning of Diesel Works of the Power House and Residential Camp. Distribution up to Customer Services Including Civil & BuildingStation Along with 13.8 Kv Substation and Transmission / Power 39.46 SEC Abha 1/2/00 15/1/0
15 King Fahd International Air Port 7MW Diesel Generator Project Including Design, Supply ,Installation and Commissioning 25.46 KFIA Dammam 15/11/00 30/7/02
16 Bisha Black Start Diesel Generator Project Including Design, Supply ,Installation and Commissioning 9.5 SEC Abha 20/7/05 1/9/07