Sr.# |
Project Description |
Value MSAR |
Client |
Start Date |
End Date |
1 |
380kV Transmission Line from Jubail 380/230 kV SS. To Maaden 380kV Sub Station |
243.7 |
Saudi Mining Co. |
01.11.07 |
20.10.09 |
2 |
Turnkey Construction of 132 kV OHL Line Length: 251 km From Tabook S/S To Tayma S/S |
71 |
SEC(WR), Jeddah |
01.07.02 |
30.07.04 |
3 |
Turnkey Construction of 132 kV OHL Line Length: 251 km From Tabook S/S To Tayma S/S Maaden 380kV Sub Station |
153 |
SEC(CRB), Riyadh |
01.11.99 |
30.05.04 |
4 |
380 Kv Transmission Line Rabigh - Madinah ( Foundation and Tower Erection ). |
26.58 |
SEC West / Jeddah |
Jan.91 |
May.92 |
5 |
Design, Supply of Materials, and Commissioning of 6x40 MVA, 110/15 kV Power Transformers for Extension of Al Bayah Substation Madinah Al Munawwarah. |
12.6 |
SEC West (EWR) / Jeddah |
Aug95 |
Apr.98 |
6 |
Design, supply, and commissioning of 6x40 MVA, 110/15 kV Power Transformers for Extension of Jeddah Substations. |
12.6 |
SEC West (EWR) / Jeddah |
Nov96 |
Nov.98 |
7 |
380 kV and 132 kV Overhead Transmission Lines From PP-9 (S/S 9009)to S/S 9001 To Existing Riyadh-Al Kharj Line. Installation Work Including Tower Foundations & Tower Erection. |
25 |
SEC, Central / Riyadh / (Sub Contract) |
Mar96 |
May97 |
8 |
Design, Supply of Materials and Construction of 380 kV double Circuit overhead Transmission Line from Ghazlan II To Alfadhili and Ghunan Substation. Line Length ; 288.4 Km.Power Plant |
406 |
Dammam / (Main Contractor) |
June97 |
July99 |
9 |
Design, Supply of Material and Construction of 380 kV Double Circuit Overhead Transmission Line from HVE Substation Diversion Point of Rabigh- KMT Line |
22.6 |
SEC West (EWR) / Jeddah / (Main Contractor) |
Nov98 |
Nov20 |
10 |
Design, Supply of Materials and Construction of 132 kV Double Circuit Overhead Transmission Lines in Riyadh, Quieieh & Qassim. Line length ; 211 km. Muzahmeya, |
160 |
SEC Central / Riyadh / (Main Contractor) |
Nov.2000 |
July2005 |
11 |
110 Kv OHTL From Loop in Point of Madinah South - Bir Ali Line To New 110Kv Madinah Industrial City S/S |
10.5 |
SEC Central / (Main Contractor) |
Jan.2001 |
Jan.2002 |
12 |
Kharkhair Electrification Project; Including Design, Supply of Materials, Installation and Commissioning of Diesel Works of the Power House and Residential Camp. Distribution up to Customer Services Including Civil & Building Station Along with 13.8 Kv Substation and Transmission / Power |
49.18 |
SEC Abha |
1/8/95 |
20/5/00 |
13 |
Al Qwaigeelah Electrification Project; Including Design, Supply of Materials, Installation and Commissioning of 3x2.65 Foam System, Buildings , ……etc. Plant, 3 x 2000 Cum. Fuel Storage tanks, Fire fighting Systems, Diesel Power Station. Including water treatment plant, fuel treatment M.W |
64.58 |
SEC Dammam |
10/6/98 |
15/10/01 |
14 |
Extension of Kharkhair Electrification Project; Including Design, Supply of Materials, Installation and Commissioning of Diesel Works of the Power House and Residential Camp. Distribution up to Customer Services Including Civil & BuildingStation Along with 13.8 Kv Substation and Transmission / Power |
39.46 |
SEC Abha |
1/2/00 |
15/1/0 |
15 |
King Fahd International Air Port 7MW Diesel Generator Project Including Design, Supply ,Installation and Commissioning |
25.46 |
KFIA Dammam |
15/11/00 |
30/7/02 |
16 |
Bisha Black Start Diesel Generator Project Including Design, Supply ,Installation and Commissioning |
9.5 |
SEC Abha |
20/7/05 |
1/9/07 |